Dredging of Mahananda river and Rubber Dam Project

L*H=353*4(m)

Applications: Water retaining, Farm irrigation.

Location: Sadar Upazila of Chapainawabganj, Bangladesh.

Primary applications: Water retaining, farm irrigation, fisheries support

Economic benefits: The under-construction rubber dam in the Mahananda river has been showingimmense prospects of boosting production ofagriculture and fisheries in Chapainawabganjdistrict. More than 7,500 hectares of land could be brought under irrigation. As a result additional 33,750 MT of food crops will be produced every year, worth around USD 17.00 million. As a whole, the scheme will facilitate boosting round the year surface water uses for irrigation purposes. It would also help to improve the environment there, a common concern of the area.


Key challenges


  • ·  Low and highly seasonal river levels during the dry season

  • ·  Heavy siltation requiring channel restoration

  • ·  Need for flexible water-level control to support irrigation and fisheries

  • ·  Balancing agricultural demand with environmental considerations


Our solution


  • ·  Inflatable rubber dam installed to raise upstream water levels during dry seasons and provide controlled releases during wet periods

  • ·  Targeted dredging to restore channel depth, improve sediment management, and increase effective storage

  • ·  Integrated operation plan combining dam inflation schedules, irrigation demand forecasting, and water-distribution coordination

  • ·  This combined approach enhances surface-water use efficiency and reduces reliance on groundwater pumping


Technical highlights


  • ·  Structure: Reinforced inflatable rubber membrane anchored to a concrete base, designed for flexible operation and reduced civil-work complexity

  • ·  Project dimension on record: LH = 3534 (m)

  • ·  Supporting works: dredging spoil placement, maintenance access structures, and pump interfaces for irrigation distribution


Economic & social impact


  • ·  Annual crop increase: approx. 33,750 MT

  • ·  Irrigation coverage: more than 7,500 hectares

  • ·  Economic uplift: estimated at roughly USD 17 million per year

  • ·  Improved local employment opportunities through enhanced irrigation, cropping intensity, and fisheries productivity


Environmental considerations & mitigation


  • ·  Inclusion of fish-friendly operational rules during migratory seasons

  • ·  Sediment management strategy through periodic dredging

  • ·  Monitoring of groundwater recharge effects to maintain balanced water distribution

  • ·  Adaptive operation schedules to minimize ecological disruption


Measurable outcomes


  • ·  Irrigated area expansion (ha)

  • ·  Annual food-crop production increase (MT)

  • ·  Extended water-availability duration during dry months

  • ·  Improved fisheries production and local income indicators


Lessons learned & recommendations


  • ·  Combining dredging + inflatable rubber dam yields higher hydrological efficiency than either method alone

  • ·  Early involvement of farmers and local communities improves operational adoption

  • ·  Sediment, groundwater, and fisheries monitoring should be integrated into the design phase rather than implemented as a later retrofit

  • ·  Adaptive operation frameworks ensure long-term performance and environmental resilience




Dredging of Mahananda river and Rubber Dam Project


Dredging of Mahananda river and Rubber Dam Project


Dredging of Mahananda river and Rubber Dam Project


Dredging of Mahananda river and Rubber Dam Project


Dredging of Mahananda river and Rubber Dam Project


FAQ


Q1: What benefits does the inflatable rubber dam provide for irrigation?

A1: It raises upstream water levels during the dry season, creating a stable source of surface water for irrigation and reducing dependence on groundwater.


Q2: How much agricultural land will benefit from this project?

A2: More than 7,500 hectares are expected to receive improved irrigation, directly supporting higher cropping intensity.


Q3: What is the expected increase in food production?

A3: The project aims to generate approximately 33,750 MT of additional food crops per year.


Q4: How does dredging contribute to the project’s performance?

A4: Dredging restores channel depth, improves water retention, and reduces sedimentation, maximizing the effectiveness of the rubber dam.


Q5: What environmental measures are included?

A5: Seasonal operational rules, sediment-management practices, groundwater monitoring, and fisheries-friendly water-release schedules help limit ecological impact.

 