Small Hydropower Plant
2011-06-10 14:48
resource:http://www.bic-iwhr.com
【Right click - "save target as" -more information】
![]() |
Hydropower.pdf |
1. Project Overview
SHP refers to a small hydropower plant and local power supply grid. SHPs use hydraulic machinery to drive hydraulic rotation. This will in turn change hydro energy into mechanical energy, then through a generator, mechanical energy is transformed to electrical energy. Some of the main components of small hydropower plant include turbine, generator, governor, excitation system, oil pressure unit, intake water valves and electronic control equipment.
2. Hydropower Qualifications

(1)Engineering survey qualification (grade A for rock and earth engineering)
(2)Engineering supervision qualification (grade A accredited by the Ministry of Water Resources and grade B accredited by the Ministry of Construction
(3)Supervision of water conservancy equipment (grade A accredited by the Ministry of Water Resources)
(4)Engineering design qualification (grade B for hydropower generation in electric power industry and grade B for water conservancy industry)
(5)Engineering consulting qualification (grade A for rock & earth engineering, and grade B for hydropower and water conservancy engineering)
(6)Building industrial enterprise qualification (grade II for professional contracting of foundation treatment work of hydraulic structure)
(7)Grade I qualification for general contracting of municipal works
(8)Grade II qualification for general contracting of house building works
(9)Grade II qualification for professional contracting of electromechanical equipment installation works
(10)Grade II qualification for professional contracting of steel structure works
(11)Import & export enterprise qualification (handle import and export of various commodities and technologies independently or as an agent)
3. Performance of major projects
3.1 small hydropower plant Project BIC Built in China
3.2 Foreign small hydropower plant Project
3.3 Major small hydropower plant Projects BIC Involved in Recent Years
4.2.Installation Drawings
4.3. Auxiliary Equipment
4.4.Machining Workshop
5 BIC’s Expertise and Advantages
We are capable of undertaking turnkey projects (EPC), including feasibility studies, investigation, design, construction, equipment procurement and installation, commissioning and training.
●Our Company is subordinated to China’s largest water and hydropower research institute (China Institute of Water Resources and Hydropower Research). We possess strong technical capabilities and have professional and fully equipped personnel.
●We have years of experience in foreign water resources and hydropower projects, are capable of undertaking turnkey projects (EPC),and have undertaken many successful projects.
●We have many qualifications from the Chinese Ministry of Commerce to undertake international hydropower projects and have a high reputation.
Please give us your folowing data when make order:
1. Water head: Maximum head, minimum head, design head;
2. Water flow: Full flow of the power station, design flow of the unit;
3. Capacity of the power station: Capacity of each unit, unit qty;
4. Elevation: Horizontal centerline of turbine and tailrace;
5. Temperature condition: Maximum temperature over any year;
6. Length and diameter of penstock;
7. Condition of water quality: Such as sand content etc.
8. Operating manner of your station;
9. Techinical specification of generator: rated capacity, tated voltage, rated power submultiple, class of insulation, ventilative method, etc.